MANUFACTURING · NINGBO, CHINA

THE FACTORY BEHIND YOUR ACTIVEWEAR

From material receipt to packing, review the production setting, line controls and inspection route behind an activewear order.

TRACEABLE INPUTSFabric code and dye lot
SPECIALIST PROCESSHigh-stretch construction
VISIBLE QUALITYInline and final QC
01 / FACTORY EVIDENCE WALL

See the factory behind the production process

Real photos from our own production site. Every picture on this page was taken in our factory.

Illustrative the factory behind the brand
The Factory Behind the BrandWhere every LAVYSEN garment begins
Illustrative fabric warehouse
Fabric WarehouseFabric stored by color and lot, ready for production
Illustrative cutting room
Cutting RoomAutomated cutting with digital pattern layout cuts fabric precisely to the approved marker.
Illustrative pattern making room
Pattern Making RoomPatterns are drafted, digitized and graded here so every size fits consistently
Illustrative in-house testing lab
In-House Testing LabFabric conditioned and tested in-house for quality and consistency
Illustrative sample room
Sample RoomSample garments reviewed with buyers before bulk production
Illustrative automated hanging line
Automated Hanging LineGarments move on an automated line, tracked station to station
02 / PEOPLE & EQUIPMENT

Match capability to approved construction

Production equipment, specialist operators and an agreed process map support the approved construction and quality scope.

Construction capability

  • CAD pattern systems
  • Cutting equipment
  • Overlock / Flatlock / Coverstitch / Bartack
  • Printing / heat transfer
  • Packing and post-process

Specialist team

  • Pattern and sample
  • Cutting
  • Sewing
  • Inline and final QC
  • Packing and warehousing
Illustrative specialist sewing team
Specialist sewing team

Automatic cutting, bonding, laser work, heat transfer, embroidery, printing and washing are handled in-house or by vetted partner mills under our direct QC supervision.

03 / PRODUCTION FLOW

Seven control points, one order

Each production stage hands its approved input and inspection record to the next team.

Drag or use the arrows to see the full flowSwipe sideways to see the full flow →

01Incoming fabricCode, width, shade and lot
02Relax & spreadApproved knitted-fabric method
03Cutting controlMarker and pattern version
04Sewing / first articleCheck against PPS
05Inline QCCorrect while work is on line
06Final QCAgreed sampling and defects
07Packing releaseRatio, labels and cartons
04 / QUALITY IN PRODUCTION

Quality Checked at Every Stage of Production

Incoming fabric, in-line work and finished garments are all checked against the approved pre-production sample (PPS) and measurement specifications.

Illustrative fabric inspection
Fabric InspectionIncoming rolls are checked for shade, width and defects before release to cutting.
Illustrative climate & humidity chamber
Climate & Humidity ChamberFabric is conditioned and tested under standard temperature and humidity for repeatable results.
Illustrative tensile tester
Tensile TesterStretch, tear and seam strength are measured to the agreed test method.
Illustrative pilling & light box
Pilling & Light BoxPilling and colorfastness are graded; shade is matched under standard lighting.
Illustrative qc bench & records
QC Bench & RecordsTest data and retained samples stay linked to each fabric lot and PO.

Defects are graded as Critical, Major or Minor; dye-lot separation, isolation, rework and CAPA actions all follow the agreed quality control plan.

05 / INSPECTION & DOCUMENTATION

Inspection routes that suit your project

Internal review, buyer inspection and independent third-party inspection can be arranged to the agreed scope.

MORE MANUFACTURING CONTROLS
06 / FABRIC WAREHOUSE

Trace material into the garment

Illustrative fabric storage area
Fabric Storage Area

Record Fabric Code, color, dye lot and PO at receipt and storage. Link finished garment batches to fabric and trim lots; keep buyer-exclusive material and remnants under agreed controls.

07 / PLANNING & LEAD TIME

Start the clock from approved inputs

Planning window: 40–60 DAYS after PPS approval, deposit and fabric readiness. Book line capacity and track Fabric Ready → Cutting → Sewing → Inline QC → Final Inspection → Ex-factory. Peak demand and holidays can alter timing; rush orders require actual capacity review.

08–10 / OPERATING CONTROLS

Supplier scope, evidence and repeatability

External processes

Declare dyeing, printing, embroidery, bonding, washing and special-trim partners; maintain approved suppliers and buyer-approved changes. Do not transfer complete garment production without permission.

Certificates & responsibility

Our Ningbo factory holds current BSCI and ISO 9001 certificates; copies are shared under NDA during the quotation stage. Social audits are not garment quality certificates.

Repeat & scale

Carry forward Fabric Code, pattern, PPS, color standard and QC history. Quote replenishment separately with and without stock fabric; 1,000 / 3,000 / 5,000-piece scale needs a forecast and line plan.

READY TO START

READY TO REVIEW THE FACTORY?

Request recent factory photos, a video tour, or an on-site / third-party audit review.

BOOK A FACTORY TOUR